Documentation / Analysis modules

Analysis modules

Engineering and regional modules that sit alongside interpretation: material balance, unconventionals, facies and restoration, regional geology and maps, and reservoir.

Material balance

Tank material balance for oil and gas: diagnose, match on pressure, forecast.

  • Black-oil PVT from Standing / Vasquez-Beggs with the Dranchuk-Abou-Kassem z-factor and McCain Bw, tuned to lab CCE, DL and separator data (PVT Lab Fit) or replaced by a lab table; modified black oil (Rv) for volatile oil and gas condensate.
  • History: type it in, paste it, load a CSV or Excel file with column mapping, or pull project production. Pull project production sums the wells you tick — by landing zone, or one by one — month by month, with no row limit.
  • Aquifers: small pot, Schilthuis, van Everdingen-Hurst radial and linear, Fetkovich and Carter-Tracy, superposed on the pressure history.
  • Diagnostics: Havlena-Odeh, Campbell, Cole, p/z and geopressured p/z*, and an aquifer check — F/Et against (We·Bw + injection)/Et, a line of slope 1 through N when the aquifer model is right (slope above 1: aquifer too weak; below 1: too strong; a curve: wrong geometry or size).
  • History match on pressure (simulation) or on underground withdrawal. Pressure matching simulates the tank pressure from the cumulative withdrawals alone and fits it to the surveys — the stricter test; withdrawal matching is the graphical form. Matches run in the background, and the pressure-match chart shows measured against simulated pressure with the RMS error.
  • Results: drive indices now and as an energy plot through the history, the computed terms table, and Excel / PDF / JSON exports.
  • Forecast: wells deliver against the tank pressure (linear PI, or Vogel below the bubble point; gas wells by the backpressure equation q = C·(p̄² − pwf²)^n). Each step solves the tank from where the history ends, with a predictor-corrector so long timesteps don't over-produce, and stops at the first limit (pressure, rate, water cut, GOR, time).
  • Match to history (Forecast tab) tunes the Corey relative permeability — exponents, end-points and critical gas — to the measured water cut and producing GOR at the material-balance saturations, so forecast water and gas follow what the field has done.
  • Multi-tank: communicating tanks linked by transmissibility, each with its own PVT, aquifer and wells.
  • Uncertainty: Monte Carlo over the uncertain inputs with misfit filtering, and tornado sensitivities. Cases save to the project.

The forward solver carries the aquifer state from step to step instead of re-evaluating the whole history for every trial pressure: a pressure regression on a decade of surveys takes a fraction of a second, and forecasts and multi-tank runs are correspondingly quicker. The module also has its own in-app guide with the full equation set.

Unconventionals

Production data in, decline curves for every well, type wells, rate-transient analysis.

Built on the project's real production. Six tabs: Wells & data, Decline analysis, Batch forecast, Type wells, RTA, and the Screening tools. An empty project can open the example wells (thirty made-up horizontals generated in the browser, never saved) to try everything first.

TabWhat it doesNeeds
Wells & dataEvery well with completions, cumulatives, peak rate and saved EURs; import and export—
Decline analysisFit, review and save one well at a time (↑/↓ wells, S save, Enter save and next)Monthly or daily production
Batch forecastForecast every well at once on all CPU cores; flags the ones to checkProduction
Type wellsP10/P50/P90 and mean by producing month, a fitted type curve, the EUR spreadProduction; lateral lengths for normalising
RTALinear-flow parameter, end of linear flow, contacted OOIP/OGIPDaily rates with flowing pressure
Screening toolsTOC, brittleness and gas in place from logs, oil sands, geomechanics, frac design, drilling, seismicity—

Importing data

  • Wells & data → Import, or drop a file on the dialog: CSV, TSV or Excel (.xlsx). Large files are read in the background, so the page stays responsive.
  • Layouts it reads: one row per well and date (state, IHS and Enverus-style exports), one well per file, and one column per well.
  • It works out the well name / UWI / API, date, oil, gas, water, days or hours on, tubing, casing and bottom-hole pressure, and choke columns; monthly or daily from the date spacing; volumes or daily rates (BOPD, Mcf/d…); units (bbl, m³, Mbbl, Mcf, MMcf, m³, 10³m³); and dates in ISO, US or day-first order, month names, YYYYMM or Excel serials.
  • Every guess can be changed before anything is written: the role of each column, the layout, frequency, units and date order. “Check the data” then shows rows, wells (in the project / new), the date range, repeated well-dates (added together) and skipped rows with the reason.
  • Wells are matched to the project's by UWI digits, then by name; new ones are created (a production-only project gets a “Wells without seismic” holder survey). Re-importing replaces the same months or days rather than doubling them.
  • Completion header files (lateral length, stages, clusters, proppant, fluid, landing zone, first production, spacing, TVD) are recognised by having no dates; metres and thousand-pound units are converted.
  • Exports: monthly production, well headers, forecast parameters, and monthly forecast volumes per well for economics packages.

Decline curves

  • Models: modified hyperbolic (Arps with a terminal decline), two-segment hyperbolic (a transient b, often above 1, switching to a boundary-dominated b at a set day — the end of linear flow from RTA), stretched exponential (SEPD), Duong, and power-law exponential. Every model switches to the terminal decline once its own decline falls below it.
  • Fitting minimises the error in ln(rate) with bounded parameters and several starting points. It starts at peak rate by default and leaves out shut-in months, partial months and spikes (robust z-score against the local trend).
  • Click a point to leave it out or put it back; drag a fit window with Fit window. “Change just this well” gives one well its own model or settings; the others keep the project defaults.
  • Rates per calendar day or per producing day; b bounds or a fixed b; terminal decline; economic limit; maximum life; late-time weighting.
  • Results: EUR, remaining reserves, cumulative to date, current rate, the year the limit is reached, R² and the points used. With uncertainty samples on, a residual bootstrap gives P90 / P50 / P10 EUR.
  • Checks raised automatically: short history, poor fit, b at a bound, rate rising at the end, forecast missing the last rate.
  • Saved forecasts are marked reviewed (green) or auto (blue) in the well list. Batch runs keep reviewed forecasts and, by default, each well's hand edits.

Type wells

  • Choose wells by landing zone, first-production year and lateral length, then tick or untick individually.
  • Normalise to a target lateral length, rate × (target / lateral)^exponent (1 = in proportion; below 1 credits long laterals less). Align at peak month or first production.
  • Extend each well with its forecast: without it the late months are left to the few oldest wells (survivor bias). Wells without a saved forecast are forecast on the spot with the project settings.
  • The chart shows every well behind the P10, P50, P90 and mean lines, with the number of wells (with history, and with the forecast fill) under it. A decline curve is fitted to the P50 or the mean line.
  • EUR statistics: P90 / P50 / P10, mean, Swanson's mean and P10/P90, with an exceedance plot. Type curves save to the project and export as a monthly profile.

Reserves convention throughout: P90 is the low case (a 90% chance of doing better), P10 the high case.

Rate-transient analysis

  • Wells with daily rates and a flowing pressure. Use bottom-hole pressure, or casing or tubing pressure plus a column gradient × TVD.
  • Diagnostic plot: normalised rate q/Δp (oil) or q/Δm(p) (gas, real-gas pseudo-pressure from the z-factor and gas viscosity) and the Bourdet derivative against material-balance time. A half slope is linear flow into the fractures; a unit slope is boundary-dominated flow.
  • √t plot: the slope through linear flow gives A·√k (total fracture face area × √permeability) and, with the fracture count and net pay, x_f·√k; it also marks the end of linear flow. Drag a Linear window to choose the stretch.
  • Contacted volume by dynamic material balance: the OOIP or OGIP whose average pressure keeps q/(p̄ − pwf) constant through boundary-dominated flow, shown on the flowing material balance (oil) or flowing p/z (gas) plot. Drag a BDF window to choose the period; a productivity spread above about 10% means it isn't boundary-dominated yet.
  • Constant-rate solution with material-balance time by default; constant pressure is available (its linear-flow constant is π/2 larger).

Screening tools

  • Shale gas: Passey ΔlogR TOC, Rickman brittleness, and gas in place — free gas with Bg from the z-factor at reservoir pressure and temperature, adsorbed gas from a Langmuir isotherm (VL scaled by TOC, PL) on the rock mass.
  • Oil sands viscosity, SAGD steam-oil ratio and bitumen in place; 1D mechanical earth model; PKN, KGD and radial frac geometry; wellbore stability and torque/drag; fault slip tendency and water balance.

Facies Studio and Restoration 2D

Paleo-facies mapping and section balancing.

  • Facies Studio aggregates the wells’ quick-look facies per stratigraphic unit and turns them into trend maps, vertical trends and a 3D facies volume you can slice unit by unit; the cutoffs update everything live.
  • Restoration 2D takes the horizons and fault sticks on the current section, removes fault offsets (simple shear), flattens on a datum horizon and optionally decompacts. Line-length and extension figures check whether the interpretation balances.

Regional geology and maps

Regional context around the survey (Maps workspace).

  • Basins: a world map of sedimentary basins by type, with geology, stratigraphy, plays and a regional map for each; geology sketches (basin cartoon, field section, chronostrat chart, burial history, paleogeography) and basin modelling (burial, subsidence, thermal maturity, source kinetics, events chart, flexure).
  • Plays, Sequence Strat and Companies (operators by country and segment).
  • Time Scale: the ICS geological time scale; click any interval to zoom in, search to highlight.
  • Basemap: the survey outline, wells and culture on a street or satellite map. Field & Production: production, economics, scenarios and cross-sections for a field.
  • Background maps come from open services and can be your own QGIS Server; see Workspace and navigation → Background maps.

Reservoir and volumetrics

From mapped surfaces to volumes and economics.

  • Volumetrics from gridded surfaces with area-depth or grid-based bulk rock volume and per-zone property inputs.
  • Monte Carlo simulation with histograms, CDFs and P90/P50/P10 bands, plus EUR-versus-NPV cross-plots.
  • Scenario and economics panels for quick screening of development cases.

Reservoir Modeling

From structural framework to flow simulation and history matching, one tab per step (Analyze → Reservoir).

TabWhat it does
StructuralGrid framework and structural framework, with a dip-view cross-section of the model
StratigraphicStratigraphic column, a column preview and a correlation panel across the wells
ZonationZone definitions and sub-layering, shown as a zonation column; Apply to 3D grid
FaciesFacies catalogue and proportions, upscaled (Vp-weighted) averages, and a stochastic facies map in plan view
PetrophysicalArchie parameters, pay cut-offs (Vsh, porosity, Sw), property priors and a net-pay flag preview
Data & TrendsInput statistics for property modelling: histograms, cell declustering for clustered wells, and experimental variograms with spherical fits
Geostat ModelingOrdinary kriging and sequential Gaussian simulation for continuous properties; sequential indicator, plurigaussian and object-based (channels, lobes) simulation for facies
SaturationInitial water saturation from height above the free-water level, with several transition-zone functions and per-facies parameters, compared with the log-derived Sw at each well
VolumetricsIn-place volumes deterministically and by Monte Carlo (for full probabilistic volumes and risking of prospects, see Volumetrics & Risk)
RiskingGeological chance of success and input uncertainty
EngineeringPVT and pressure, material balance (p/z for gas, Havlena–Odeh for oil), Vogel inflow performance, Arps decline curves and a recovery-mechanism diagnostic
UpscalingFine-grid property distributions coarsened per zone
SimulationA tank model (black oil or gas) with aquifer support, injection, Corey fractional flow, a drill schedule, an economic limit and a sensitivity sweep
1D DisplacementBuckley–Leverett fractional flow, Welge tangent, the saturation profile, breakthrough and recovery
History Match & EnsembleGrid ensemble history matching (ES-MDA) against observed rates, water cut and pressure, with an ensemble fan; or fast tank screening with a probabilistic ensemble
Fracture ModelingDiscrete fracture networks, orientation analysis and the effective permeability tensor
Simulation GridStair-step and hybrid grids built from top and base horizons and fault sticks, for flow or geomechanical simulators
Flow Simulation & UpscalingA three-phase black-oil simulator (IMPES) on the grid: rock, PVT, Corey relative permeability, initialisation and aquifer, wells with rate or pressure control; results as production profiles, pressure and water cut, recovery, property maps per layer and per-well results

Each tab has Focus and Detach on it while it is open, and the tabs can be dragged into any order.

Volumetrics & Risk

Oil, gas and mineral resources, deterministic and probabilistic, with chance of success (Maps → Volumetrics & Risk).

  • Every input has a distribution: fixed, triangular, PERT, uniform, normal (optionally truncated) or lognormal given by its P90 and P10. The deterministic case uses each input's most likely value; the Monte Carlo run samples them, and the same seed repeats the same run.
  • Inputs can be correlated (for example porosity with water saturation); contradictory correlations are scaled back until they are consistent, and the scaling is reported.
  • Petroleum: gross rock volume from area × thickness × geometric factor, entered directly, or from the Structure map's depth surface. From the map, the closure is flooded from its crest, so only rock connected to the crest above the contact counts; the crest, spill point and closure area are shown, and the column can be limited to the gross thickness.
  • Results are STOIIP or GIIP and recoverable volumes (MMbbl or Bcf, with SI units alongside) as most likely, P90, P50, P10 and mean. P90 is the low case: a 90 % chance of at least that much.
  • Minerals: tonnage from volume × bulk density, grade, contained metal (Moz for g/t and ppm, kt for %) and recovered metal.
  • Geological chance of success is the product of its factors (trap, reservoir, seal, charge; or mineralisation, continuity, grade, metallurgy). The risked mean is Pg × mean, and a minimum economic size gives the commercial chance.
  • A factor's chance can be a range (± range): low and high around the best estimate, drawn as PERT. Pg is then simulated and shown as its mean with P90 / P50 / P10 and the factor that makes it most uncertain; the economics show the EMV at Pg's P90 and P10, and say when the decision turns on how sure the risking is.
  • Chance adequacy matrix (Matrix): for each element choose how good the data are (poor, fair, good) and what they say (unfavourable … favourable); the cell sets the chance and its range. Good, favourable data support about 94 %, good, unfavourable about 6 %; poor data stay near 50 % with a wide range whatever they seem to say, because they can't support confidence either way. The choice is kept with the factor.
  • Risked outcome: failure included, as a histogram with the dry spike at zero and the risked P90 / P50 / P10 and mean (P90 is zero whenever the chance of failure is above 10 %), next to the chance of nothing.
  • Decision tree (in Economic risking): drill now, walk away, or buy information first (new seismic, a study, an appraisal) given its cost and reliability: how often it says “go” when there is a discovery and “no” when it would be dry. Bayes' rule gives Pg after each answer; the tree drills only where that pays, rolls back to EMVs, highlights the best choice, and gives the value of the information (what it could be worth paying) and of perfect information (the most any data could be worth).
  • Sampling: Latin hypercube (the default) samples every slice of each input's range once, so percentiles settle with far fewer trials than plain Monte Carlo, which is also offered. A convergence chart shows P90, P50, P10 and the mean as trials accumulate.
  • Charts: probability of at least each volume (success case and risked), the distribution, a one-at-a-time tornado, and the contribution of each input to the variance (squared rank correlation, which also captures correlated and nonlinear effects). Results export as CSV.
  • Economic risking: with a net value per barrel, Mcf, ounce or tonne, a development cost and an exploration-well cost, each discovery is developed only if it is worth more than its development; the result is the expected monetary value (EMV = Pg × mean value of the discovery − exploration cost), the chance of a profit, the break-even size and the outcome range, with a plain drill / don't-drill reading.
  • Portfolio: prospects added from either tab are combined, petroleum as barrels of oil equivalent (6 Mcf = 1 bbl). Prospects can share a play: each trial draws the play once and its prospects succeed only if it works (their own chance is Pg ÷ play chance). Shared play risk keeps the mean but widens the outcome and lowers the chance that at least one succeeds; the independent case is shown beside it.
  • Shared elements: instead of a whole play, prospects can share single elements, for example one charge system or one regional seal. Open Shared elements on a prospect and name a group for an element; every prospect with that group succeeds or fails on that element together (one draw per trial), while its other elements stay its own. A member whose chance for the element is lower than the group's draws its own share of it. Prospects keep their chance factors when added to the portfolio for this.
  • Evidence: what the data say about each element of a prospect (source, charge, reservoir, trap, seal, preservation), saved in the project for everyone on it. Each item names its source and, if it comes from data already cited, what it rests on, so the same data counts once. The chance adequacy matrix proposes a chance for each element, and a geoscientist accepts or changes it.
  • Data cited for two elements is flagged, because their chances are then not independent: alongside Pg is the most it could be if those elements stand or fall together. System confidence comes from the evidence and exploration maturity is set by hand, because they are different things. Use in the Petroleum tab sends the six chances on to risking. These numbers are structured judgement, not calibrated probabilities.
  • Discoveries: the chance of 0, 1, 2, … successes in the portfolio, which shared risk pushes towards all or nothing.
  • The Project tree has a Volumetrics & Risk entry: open a tab, see whether the map on screen can give rock volume, and the portfolio's prospects.